Bogus, S M, Molenaar, K R and Diekmann, J E (2005) Concurrent Engineering Approach to Reducing Design Delivery Time. Journal of Construction Engineering and Management, 131(11), 1179–85.

Carr, P G (2005) Investigation of Bid Price Competition Measured through Prebid Project Estimates, Actual Bid Prices, and Number of Bidders. Journal of Construction Engineering and Management, 131(11), 1165–72.

El-Diraby, T E and Wang, B (2005) E-Society Portal: Integrating Urban Highway Construction Projects into the Knowledge City. Journal of Construction Engineering and Management, 131(11), 1196–211.

El-Rayes, K and Khalafallah, A (2005) Trade-off between Safety and Cost in Planning Construction Site Layouts. Journal of Construction Engineering and Management, 131(11), 1186–95.

Fredericks, T K, Abudayyeh, O, Choi, S D, Wiersma, M and Charles, M (2005) Occupational Injuries and Fatalities in the Roofing Contracting Industry. Journal of Construction Engineering and Management, 131(11), 1233–40.

Hanna, A S, Menches, C L, Sullivan, K T and Sargent, J R (2005) Factors Affecting Absenteeism in Electrical Construction. Journal of Construction Engineering and Management, 131(11), 1212–8.

Ibbs, W (2005) Impact of Change’s Timing on Labor Productivity. Journal of Construction Engineering and Management, 131(11), 1219–23.

Jin, X and Yng Ling, F Y (2005) Model for Fostering Trust and Building Relationships in China’s Construction Industry. Journal of Construction Engineering and Management, 131(11), 1224–32.

Kim, Y, Kim, K and Shin, D (2005) Delay Analysis Method Using Delay Section. Journal of Construction Engineering and Management, 131(11), 1155–64.

Lee, H, Ryu, H, Yu, J and Kim, J (2005) Method for Calculating Schedule Delay Considering Lost Productivity. Journal of Construction Engineering and Management, 131(11), 1147–54.

Nassar, K M, Nassar, W M and Hegab, M Y (2005) Evaluating Cost Overruns of Asphalt Paving Project Using Statistical Process Control Methods. Journal of Construction Engineering and Management, 131(11), 1173–8.

Pheng, L S and Tan, J H (2005) Integrating {[}ISO 9001{]} Quality Management System and {[}ISO 14001{]} Environmental Management System for Contractors. Journal of Construction Engineering and Management, 131(11), 1241–4.